Shanghai Nianlai Mould & Technology Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Wang Daniel
  • Company Name : Shanghai Nianlai Mould & Technology Co., Ltd.
  • Tel : 86-21-59757515
  • Fax : 86-21-59757505
  • Address : Shanghai,Shanghai,No.10, Huqingping Road, ZhaoXiang, Qingpu District
  • Country/Region : China
  • Zip : 201703

Plastic Shoehorn

Plastic Shoehorn
Product Detailed
Related Categories:Shoe Horns
1.mold for Plastic Shoehorn 2.High quality 3.Competitive price. 4.advanced technology with 15 years experiences
MOULD SPECIFICATION
Mold baseSteel l2344(Germany) Hrc 54-56
HardnessStandard
CavitySingle or multiple
Product materialPA,PP,PC/ABS,TPE etc.
SoftwareUG,Solid Works,ProE, CAD, etc.
Runner:Hot/Cold.
Mould Life1000K
MachineCNC ,spark machine, the line shear machine, the grinder
PURCHASING STEPS
1.NegotiationQuality,quantity,material,quotation,payment, delivery time.
2.Place orders 
3.R&DAccording to customer's drawings or samples.
4.Design confirmationSend drawing for customer approval.
5.Mould processingStart mould manufacturing after customer's confirmation of drawing.
6.Sample TestTest and send initial samples to customer.
7. FeedbackGot feedback from customer,if ok,move to next step,if not, modify mould back to step 6 until get approval.
8.Mass Production 
9.Delivery  
      
Injection Mould experience:
1. Multiple cavities Injction Mould
2. Insert Injection Mould
3. Multiple slider action Injection Mould
4. Sandwich Injection Mould
5. Hot runner system
6. Injection Mould with international standard, like HASCO, etc.
7. Other custom Injection Mould
      
Specifications
Tight tolerance,
Long mold life time,
Short cycle time,
Nice appearance,
Maintenance easily,
 
We are a experienced  injection molder located in Shenzhen, China.
 
Our Products/Services:
 - Plastic Injection Mold Design
 - Plastic injection Mold Making
 - Plastic Injection molding
 - In-Mold Decoration
We are familiar with :
- DEM,HASCO standards;
-Incoe,Yudo, Mold-Master, Hasco hot runners;
-Hasco,LKM mold bases;
 
Our Competitive Advantage:
 - Prompt response (respond within 12 hours)
 - Complete quality control system for every stage of mould-building or moulding.
 - Competitive Prices
 - Advanced Project Tracking System;
 - Short Lead Times: 4~7 weeks for mold fabrication after confirmation.
 - Rich Experiences in exporting molds to overseas markets.
MOULD SPECIFICATION
Mold baseSteel l2344(Germany) Hrc 54-56
HardnessStandard
CavitySingle or multiple
Product materialPA,PP,PC/ABS,TPE etc.
SoftwareUG,Solid Works,ProE, CAD, etc.
Runner:Hot/Cold.
Mould Life1000K
MachineCNC ,spark machine, the line shear machine, the grinder
PURCHASING STEPS
1.NegotiationQuality,quantity,material,quotation,payment, delivery time.
2.Place orders 
3.R&DAccording to customer's drawings or samples.
4.Design confirmationSend drawing for customer approval.
5.Mould processingStart mould manufacturing after customer's confirmation of drawing.
6.Sample TestTest and send initial samples to customer.
7. FeedbackGot feedback from customer,if ok,move to next step,if not, modify mould back to step 6 until get approval.
8.Mass Production 
9.Delivery  
      
Injection Mould experience:
1. Multiple cavities Injction Mould
2. Insert Injection Mould
3. Multiple slider action Injection Mould
4. Sandwich Injection Mould
5. Hot runner system
6. Injection Mould with international standard, like HASCO, etc.
7. Other custom Injection Mould
      
Specifications
Tight tolerance,
Long mold life time,
Short cycle time,
Nice appearance,
Maintenance easily,
 
We are a experienced  injection molder located in Shenzhen, China.
 
Our Products/Services:
 - Plastic Injection Mold Design
 - Plastic injection Mold Making
 - Plastic Injection molding
 - In-Mold Decoration
We are familiar with :
- DEM,HASCO standards;
-Incoe,Yudo, Mold-Master, Hasco hot runners;
-Hasco,LKM mold bases;
 
Our Competitive Advantage:
 - Prompt response (respond within 12 hours)
 - Complete quality control system for every stage of mould-building or moulding.
 - Competitive Prices
 - Advanced Project Tracking System;
 - Short Lead Times: 4~7 weeks for mold fabrication after confirmation.
 - Rich Experiences in exporting molds to overseas markets.

Plastic Shoehorn



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.